Is it possible to have the vCenter and View components in a difference domain from the isolated domain controller one would create for the load test? So vCenter and View are in domain A (production) and all test VMs (client and desktop) are in domain B (isolated Domain with the View Planner agent?). I am not sure if we can the customer vCenter server and View Connection servers out of their current production domain (even through it is not in production yet), join it into the isolated DC, and put everything back again at the end of the test.
↧